Include Welcome Center, an Academic, Advising and Resource Center, various student support resources, and lobby and café spaces
Planned Transformation - 2,000 Residential units, 94,000 sft Retail space, 33 Acres Business Park, 1.1 Acre community park, Student/Faculty Staff Housing
250-bed dormitory, 750-space parking garage
1,500-bed
1,403 parking spaces
1,073 student beds and a 538-space
456 beds
Programming in progress with AC Martin Architects
Feasability Study to Commence 1/2021
The Trustees will issue a separate contract to a licensed architect to perform all design services for this project. The existing complex consists of several interconnected structures that house musical performing art spaces and total 66,476 gross square feet. These existing facilities will undergo a renovation, and the existing 61 modular practice rooms will be removed and replaced with a new building of approximately 10,000 to 12,000 GSF that will house practice rooms, music lesson rooms, and
Scope - Renovation and adition of space, grow existing child care program by approx 50 children, construction to start 2022
Working with consultant Brailsford and Dunlavey - completed needs assessment
Large scale renovation of 6 buildings within the Hillside Commons student dorm complex - Currently in Concept Phase
Feasibility Study to Commence in 1/2021, $7M raised in private donations to date
Large scale replacement of Parkside commons complex - Currently in Concept Phase
Roof Replacement, Fire Supression System, Sewer Line Upgrade, HVAC Replacement
JFAK did feasibility study
550 beds
600 beds
100 acres of campus land designated for athletics and recreational uses; dependent on public-private partnership funding
600 beds
114 units; 66 one-bedroom units and 48 two-bedroom units with garages for faculty and staff.
600 beds
1500 spaces
105 two-story townhome residences with garages for faculty and staff.
900 spaces
129 townhouse-style residences. Each unit will be two stories with approximately 1,575 GSF and have a two-car garage.
Over 3 phases and time periods
840 beds
6,000 seats
1200 spaces
400 bed
3,250 seats for baseball and 570 seats for softball
1000 beds
2000 beds
3000 beds
1500 (out of 6000 total)
Solicitation Documents expected prior to 6/21
400 bed
2000 bed
DB Bridging Documents RFQ Due 8/5/2020
832 beds
1226 parking spaces
500 spaces
450 beds
8,800 seats