Name
Stage
Stage 0 - Strategic Definition
Count
2
1
Develop Business Case
2
Project Programme
3
Provide Building Requirements
4
Client Consultation
5
Define Budget
6
Summarise Brief
7
Land Searches
8
Advise on Appointment of Other Consultants
9
Collect Fee Proposals from Other Consultants
10
Appoint Consultants
11
Advise Client on requirement for CDM Principal Designer
12
Appoint CDM Principal Designer
13
Topographical and measured survey
14
Design Coordination
15
Concept Design
16
Outline budget
17
Outline Structural Design
18
Environmental Performance Assessment
19
Ongoing management of CDM File
20
Ecology Survey
21
Highways report
22
Arboricultural report
23
Building Conditions Report
24
Develop Design
25
Planning - Initial Consultation
26
Pre planning cost report
27
Developed Structural Design
28
Outline Building Fabric Design
29
Ongoing management of CDM File
30
Write Design and Access Statement
31
Write Planning Statement
32
Prepare Planning Application
33
Discharge Planning Conditions
34
Below Ground Drainage
35
Contractor Suggestions
36
Contractor Selection
37
Prepare Drawing Package
38
Prepare Specification
39
Prepare Bill of Quantities
40
Lighting and Electrical Design
41
Audio Visual Design
42
Building Services Design
43
Detailed Structural Design
44
Kitchen Design
45
Information for Building Control
46
Building Control Report / Sign off
47
Make Recommendations on Finishes and Fittings etc
48
Approve Finishes and Fittings etc
49
Technical design cost report
50
Prepare Tender
51
Liaise with CDM Principal Designer and provide info
52
Ongoing management of CDM File
53
Arrange Utility Connections/Alterations
54
Chair Site Meetings
55
Contract Administration
56
Prepare Valuations
57
Inspect Work Onsite
58
Prepare Certificates
59
Monitor Construction Costs During Build
60
Prepare Building Maintenance Manual
Stage
Stage 1 - Preparation and Brief
Count
4
Stage
Stage 2 - Concept Design
Count
17
Stage
Stage 3 - Developed Design
Count
9
Stage
Stage 4 Technical Design
Count
21
Stage
Stage 5 - Construction
Count
6
Stage
Stage 6 - Handover and Close Out
Count
1
Drag to adjust the number of frozen columns
Stage
Required
Responsibility
Summary
Summary
Summary
Stage 0 - Strategic Definition
Client
Stage 0 - Strategic Definition
Client
Stage 1 - Preparation and Brief
Client
Stage 1 - Preparation and Brief
Architect
Stage 1 - Preparation and Brief
Client
Stage 1 - Preparation and Brief
Architect
Stage 2 - Concept Design
Lawyer (Conveyancer)
Stage 2 - Concept Design
Architect
Stage 2 - Concept Design
Architect
Stage 2 - Concept Design
Client
Stage 2 - Concept Design
Architect
Stage 2 - Concept Design
Client
Stage 2 - Concept Design
Topographic Surveyer
Stage 2 - Concept Design
Architect
Stage 2 - Concept Design
Architect
Stage 2 - Concept Design
Quantity Surveyor
Stage 2 - Concept Design
Structural Engineer
Stage 2 - Concept Design
Mechanical and Electrical Consultant
Stage 2 - Concept Design
Architect
Stage 2 - Concept Design
Ecology
Stage 2 - Concept Design
Highways Consultant
Stage 2 - Concept Design
Arboricultural Consultant
Stage 2 - Concept Design
Structural Engineer
Stage 3 - Developed Design
Architect
Stage 3 - Developed Design
Planning Consultant
Stage 3 - Developed Design
Quantity Surveyor
Stage 3 - Developed Design
Structural Engineer
Stage 3 - Developed Design
Architect
Stage 3 - Developed Design
Architect
Stage 3 - Developed Design
Architect
Stage 3 - Developed Design
Planning Consultant
Stage 3 - Developed Design
Planning Consultant
Stage 4 Technical Design
Architect
Stage 4 Technical Design
Structural Engineer
Stage 4 Technical Design
Architect
Stage 4 Technical Design
Client
Stage 4 Technical Design
Architect
Stage 4 Technical Design
Architect
Stage 4 Technical Design
Quantity Surveyor
Stage 4 Technical Design
Mechanical and Electrical Consultant
Stage 4 Technical Design
Mechanical and Electrical Consultant
Stage 4 Technical Design
Mechanical and Electrical Consultant
Stage 4 Technical Design
Structural Engineer
Stage 4 Technical Design
Kitchen Fabricator
Stage 4 Technical Design
Architect
Stage 4 Technical Design
Building Control Inspector
Stage 4 Technical Design
Interior Designer
Stage 4 Technical Design
Client
Stage 4 Technical Design
Quantity Surveyor
Stage 4 Technical Design
Architect
Stage 4 Technical Design
Client
Stage 4 Technical Design
Architect
Stage 4 Technical Design
Client
Stage 5 - Construction
Architect
Stage 5 - Construction
Architect
Stage 5 - Construction
Quantity Surveyor
Stage 5 - Construction
Architect
Stage 5 - Construction
Architect
Stage 5 - Construction
Quantity Surveyor
Stage 6 - Handover and Close Out
Contractor
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
Summary
60 records
Summary
Summary
Summary
Summary
Alert
Lorem ipsum
Okay
Appoint Consultants
Loaded
Name
Appoint Consultants
Stage
Stage 2 - Concept Design
Required
Responsibility
View larger version
Copy base