Cost Component
Cost Category
Construction: Site Work
Count5
1
Building Permit Fees
2
Impact Fee
3
Water & Sewer Fees Inspections
4
Architecture, Engineering
5
Other
6
Excavation, Foundation, Concrete, Retaining walls, and Backfill
7
Other
8
Framing (including roof)
9
Trusses (if not included above)
10
Sheathing (if not included above)
11
General Metal, Steel
12
Other
13
Exterior Wall Finish
14
Roofing
15
Windows and Doors (including garage door)
Cost Category
Construction: Foundation
Count2
Cost Category
Construction: Framing
Count5
Cost Category
Construction: Exterior Finishes
Count4
Drag to adjust the number of frozen columns
Cost Category
2019 Avg Cost
Forecasted Cost
Increase $
Inflation %
Inflation Trend
Related Commodities
Notes
Construction: Site Work
$5,086
$5,213
$127
2.5%
Low
Construction: Site Work
$3,865
$3,962
$97
2.5%
Low
Construction: Site Work
$4,319
$4,427
$108
2.5%
Low
Construction: Site Work
$4,335
$4,443
$108
2.5%
Low
Construction: Site Work
$719
$737
$18
2.5%
Low
Construction: Foundation
$33,511
$35,857
$2,346
7.0%
Moderate
Construction: Foundation
$1,338
$1,392
$54
4.0%
Moderate
Construction: Framing
$40,612
$46,704
$6,092
15.0%
Very High
Lumber
Construction: Framing
$6,276
$7,217
$941
15.0%
Very High
Lumber
Construction: Framing
$3,216
$3,698
$482
15.0%
Very High
Lumber
Construction: Framing
$954
$1,240
$286
30.0%
Very High
Steel
Construction: Framing
$530
$610
$80
15.0%
Very High
Construction: Exterior Finishes
$19,319
$20,865
$1,546
8.0%
Moderate
Lumber
Construction: Exterior Finishes
$9,954
$10,750
$796
8.0%
Moderate
Crude Oil
Asphalt
Construction: Exterior Finishes
$11,747
$12,687
$940
8.0%
Moderate
43 records

Alert