Defect No.
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
Drag to adjust the number of frozen columns
Defect Description
Photos
Location
Time logged
Resolved
Comments
Usb missing
Hotdesk area
19/1/2017
09:32
Water leak
Kitchen
19/1/2017
09:52
No backing behind skirting
Staff lounge
19/1/2017
10:00
Vinyl scratch
Kitchen
19/1/2017
10:01
Screw protruding above.
Staff lounge
19/1/2017
10:04
Bubble in feature graphic
Female toilets
19/1/2017
10:07
Vinyl or ceiling not flush
Female toilets
19/1/2017
10:11
Clean exposed vinyl glue
Female shower
19/1/2017
10:13
Reweld vinyl corner
Female lockers
19/1/2017
10:17
Door patch required
Female lockers
19/1/2017
10:25
Graphic laid on unfinished plaster
Male toilets
19/1/2017
10:37
Room not finished
Male toilets
19/1/2017
10:39
Incorrect door handle previously installed. Patch and paint holes
Male lockers
19/1/2017
10:45
Clean room generally (including within linen chute)
Linen Store
19/1/2017
11:02
Fill holes to underside of chute
Linen Store
19/1/2017
11:03
Install door stop within door closer to avoid handle clashing with wall
Linen Store
19/1/2017
11:06
Second coat to ceiling
Linen Store
19/1/2017
11:07
Gap between Skirting and joinery
Hotdesk area
19/1/2017
11:48
Puddle. Dripping from internal of window frame
Corridor
20/1/2017
08:30
Whistle sound coming through theatre 10 door
Corridor
20/1/2017
08:33
Flashing detail different to standard. Water pooling
Level 5 Roof
20/1/2017
10:11
Pressure clean rust from roof
Level 5 Roof
20/1/2017
10:14
Bird, eggs and nest to be relocated
Level 5 Plantroom
20/1/2017
10:27
31 records

Alert

Lorem ipsum
Okay